Upon inspection of this property it was apparent that the small existing absorption pit was failing. It was agreed with the owner to use Atlantis Drainage Cell to provide a long term solution which would allow vehicular traffic over the absorption trench area. 15 metres of Atlantis Drainage cell was installed in two trenches with geo textile fabric wrapped around the cells with drainage aggregate placed over. This new system increased the absorption area by more than 8 times.