H2H Plumbing were engaged to design and install a new sewer rising main from the proposed sewer pump station at Fisherman Bay through to the existing wastewater treatment plant at Port Broughton. Due to the sensitive coastal vegetation, waterways and existing cycle and walking track we completed the installation using trenchless technology. The 3.2klm 180mm polyethylene pipeline was directionally bored. Various valves including scour, air and isolation were installed along the pipeline. The project was completed on time and with minimal impact to the environment.