As a result of the school connecting to sewer, they lost their ability to treat their own wastewater and irrigate on the school oval. As a result Council was able to provide the school with a recycled water connection to ensure the oval remained irrigated. We were engaged to extend the 90mm polyethylene main to the school, install some isolation valves, flow meter and level sensing valve to control the flow to the tank.