As part of The Villages Sewer Project the engineers had determined that the Pressure Sewer System would require a pinch valve to ensure the system stayed flooded and that cleansing velocities would be achieved during normal operation. As a result we supplied and installed a pinch valve assembly with bypass, flow meters and pressure monitoring.